Home | Links | Contact Us | Press | Post a job | Bookmark
Home Aerospace and Defense Sr-Project-Scheduler


 Sr. Project Scheduler

Details
Country: USA
Location: California-San Bernardino/Palm Springs San Bernardino, CA 92408
Total applied: 40
Job Category:Engineering
Relevant Work Experience:10+ to 15 Years
Education Level:Bachelor's Degree
Location:San Bernardino, CA 92408
Status:Full Time, Employee
Occupations:Electrical/Electronics Engineering;Mechanical Engineering;Systems/Process Engineering
Career Level:Experienced (Non-Manager)
Relevant Work Experience:10+ to 15 Years
Sr. Project Scheduler

Proton Beam Therapy has become a reality to thousands of cancer survivors and is now expanding around the world. In addition to its clinical value, the Proton Beam Treatment System (PBTS) is an effective platform for international research programs requiring high-energy particle physics capabilities. Optivus Proton Therapy, Inc. is a growing manufacturer of proton beam treatment centers with corporate head quarters located in Southern California. If you are looking for an excellent opportunity in a positive environment with a stable and growing company, we welcome your resume.

Optivus is currently looking for an individual to join our team of professionals and assist us with our mission of saving lives through Proton Beam Therapy, using their skills and experience as a Senior Project Scheduler.

Job Summary:
Integrate financial data into project schedule Develop project schedules for new tasks (as required) Maintain existing project schedules on a monthly basisIntegrate and maintain all projects into overall OTI master schedule (tier 1) Initiate monthly updates for each specialization showing tasks for their team Provide individualized team member project schedules monthly Provide feedback to the Project Manager on changes made to the schedule to assist in identifying impacts/risksProvide composite work schedules quarterly and monthly across multiple projects for manufacturing, procurement, and installation.Qualifications:
The ideal candidate will have more than 10 years schedule development experience. Ability to summarize data from financial database and to generate earned value and variance reports Strong oral and written communication skills. Proficient with MS Project (required) and Excel. Ability to organize and coordinate multiple projects/tasks.Ability to use logic and common sense to determine most effective and efficient method of completing critical action items.Ability to work independently and interact professionally with Project Managers, team leaders, and engineering staff.Education:
Bachelor's degree (B.A.) or equivalent from four-year college or technical school; or four years related experience and/or training; or equivalent combination of education and experience.

- Apply for Sr. Project Scheduler


Related jobs
  Project Engineer - Structural Design, Composite, Aerospace
Based in beautiful Adelanto, CA, we are a large and fast growing Aerospace company. Due to tremendous growth, we are currently recruiting for a talented and experienced P...
  Field Engineer II
Provide support to GCCS systems as required to ensure system test, training, configuration management, documentation and other general and specific tasking as required. ...
  Software Engineer (Senior)
Perform software engineering tasks such as modification and/or development of software systems. Formulate & develop systems or subsystems architecture, requirements, and ...
  Systems Engineer (Senior)
Drives product designs and system architecture with key responsibilities in the areas of form, fit and function, performance, integrity, sustainability, interfacing with ...
  Training Specialist
Develop training curriculum, computer based training products, and training system design duties in support of GCCS-M/J development and fielding. Individual shall ...
  Sr Principal Engineer, Systems
This position is located in our CA, San Diego facilityGENERAL SUMMARY: Performs engineering work associated with the analysis, design, and development of computer ...
  Cost & Pricing Analyst
 The position is primarily responsible for collecting, analyzing, and summarizing cost/pricing data in support of bid and proposals for programs of varying ...
  Contracts Director
The Systems Engineering Group (SEG) of QinetiQ North America provides high-value engineering, software solutions, logistics information management, flight training and IT...
  Sr. Contracts Manager
The Systems Engineering Group (SEG) of QinetiQ North America provides high-value engineering, software solutions, logistics information management, flight training and IT...
  USMC Satellite SME (CA)/Technical Support Specialist II
The Systems Engineering Group (SEG) of QinetiQ North America provides high-value engineering, software solutions, logistics information management, flight training and IT...

Related press releases
Courageous reform
There can be little doubt we are making progress when it comes to improving further education. More young people and adults than ever are gaining good qualifications ever...
Half of MG Rover workers want to return
Almost a year after the collapse of MG Rover, many former workers are paid less and wish they still worked for the firm, according to a report released today. Of the nea...
Making ends meet
Earning some dosh to get through uni might seem unavoidable, but don't lose sight of the reason you are there: to get a degree. Earning shouldn't mean missing vital lectu...
Young, successful, well paid: are they killing feminism?
Chiara Cargnel wants to have it all: a high-flying career and a successful marriage. So far she is halfway there. At 26, she is an investment banker in London working ove...
The earth man cometh
I am merely the conduit,' says Patrick Holden, director of the Soil Association, when I ask him to sum up his achievement after 10 years in the job. 'The great thinkers, ...
Battle at the coalface
In his television review Rupert Smith described the NUM miners leader Arthur Scargill as "a ghastly little man who needed to be trodden on" (G2, March 23). I suppose he w...
Hutton eases small firms' pension fears
The government will not force employers to contribute to workers' pensions without making efforts to minimise the impact on firms, the work and pensions secretary, John H...
NHS hospital redundancies gather pace
A wave of redundancies across the NHS in England gathered force yesterday when a London teaching hospital announced that nearly 500 posts will be axed in an attempt to di...
Union warning over 'raw' stalls handlers
The Transport and General Workers Union (T&G) yesterday launched a fierce attack on the overall standard of the stalls handlers likely to be working at British racecourse...
Minimum wage to rise to £5.35
The minimum wage will rise by 6% in October to £5.35, the government confirmed yesterday, but it cautioned that the days of big, inflation-beating rises may be over...
©2009 UsaJobOnline - Connecting Job Seekers with Employers

Archive: All jobs